Hydro One Brampton Networks Inc. ("Hydro One Brampton"), like all electricity distributors across the province,
is required to provide customers with a Conditions of Service document that outlines our operating practices,
connection policies and the types and level of service we offer within our service area in Brampton.
We have included typical Hydro One Brampton Standard Drawings used with
Commercial and Industrial projects when three phase service(s) is required.
These drawings are made available for your use. Please consult with our
Technical Services Department if further information is required.
 |
37-114 |
Installation of Precast Foundation for Three Phase Pad-mounted |
 |
41-11 |
Three Phase Padmount Transformer Grounding Detail |
 |
37-116 |
Padmount Transformer Clearances from Vegetation |
 |
37-113 |
Installation of Precast Foundation for Single Phase Padmount Transformers |
 |
41-10 |
Single Phase Padmount Transformer Grounding Detail |
 |
37-380 |
Guard Post Detail |
 |
37-217 |
Three Phase Padmount Transformer Guard Post Installation |
 |
37-202 |
Typical Building Vault Layout |
 |
37-360
|
Prefabricated Manhole Detail |
|
 |
37-361 |
Manhole Cable Racking and Internal Grounding Detail |
 |
37-363 |
Typical Concrete Manhole Chimney Installation |
 |
37-120 |
Installation of Switchgear Foundation Base |
 |
27-15 |
General Service Meter Cabinet and Meter Socket Installation |
 |
25-40 |
Maximum Short Circuit Current |
 |
19-50 |
Typical Transformer Impedances |
 |
41-37 |
Manhole External Grounding Detail |
 |
41-25 |
Guard Post Grounding Detail |
 |
27-30 |
Electrical Room Exit - Door Latching Hardware |
 |
03-25 |
Customer-Owned Primary Terminal Pole - Underground Tap |
 |
03-26 |
Customer-Owned Primary Terminal Pole - Overhead Tap |